CASE STUDY

Lawnswood House

Supply and fix of around 1,000m² across 3 floors of Lawnswood House, Leeds — covering 6 toilet areas, lobby and reception spaces with herringbone tiling, and a tiled staircase
LOCATION:
MAIN CONTRACTOR:
SECTOR:
Leeds
Stainforth
Workspaces
TIME ON SITE:
COVERAGE:
TYPE:
3 Months
1,0000m2
Ceramic’s

Lawnswood House in Leeds was a substantial commercial tiling package, with SGB Contractors responsible for the full supply and fix across approximately 1,000m² spread over 3 floors.

The scope covered 6 toilet areas, lobby spaces, a reception area finished in herringbone, and a full tiled staircase — each area requiring its own approach whilst maintaining a consistent, high-quality finish throughout the building.

Taking on the supply as well as the installation allowed us to manage the project end to end, ensuring the right materials arrived on time and to specification. It's an approach that removes risk for the client and keeps the programme moving — and on a project of this size and complexity, that matters.

The result is a building that makes a strong first impression at every level, from the entrance through to the upper floors.

CONTACT US

Looking for a reliable tiling contractor from tender to handover?

From early-stage pricing through to delivery on site, we support main contractors with clear planning, reliable execution, and projects that stay on programme.
Discuss a Project
Discuss a Project